Delays happen on every job. How to give and read a delay notice, what to put in it, and why speaking up early protects the schedule and the relationship.
Joint compound will not dry properly in a cold, damp building. What temperature and ventilation to plan for, and how to protect a winter schedule in Quebec.
Shadow edges and reveals look effortless and are among the hardest drywall details. What goes wrong, what to coordinate and how it affects the schedule.
Joints showing through fresh paint is the most common drywall callback. Here is why it happens, what Level 4 and Level 5 really mean, and how to fix it.
Drywall sits mid-schedule, so every upstream delay lands on it. Here is where the time really goes and how general contractors can protect their dates.